
Staff Support Services
The team is also a key component of new project development and organizational design for joint venture driven projects.

Housekeeping
- Maintain high quality housekeeping services
- Maintain high level sanitary conditions complying with international standards
- Daily cleaning of bathrooms, common areas and all major areas throughout the compound
- Pest control & disinfecting services for all areas
- Empty waste containers
- Carpet cleaning

Laundry Services
- Provide daily personal laundry to all senior staff
- Laundry services deliver items dry and folded
- Personal ironing services daily for senior staff
- Use the best methods and material to maintain high standards of hygiene
- Internal audit of laundry processes
- Management reporting

Maintenance
- Basic Maintenance (Light bulb replacement, Basic electric work, A/C repair, Basic plumbing, Lock and key repair, and Kitchen equipment)
- Management reporting

Camp Technical Specifications
General Technical Specifications
- Steel Chassis (Base Frame)
- 120 mm – 140 mm I-beam for main runners, end rails, and cross members
- Cleaned, primed and painted
- Duct covered by PVC vinyl sheets of size 1.2 mm

External Walls
- External walls using corrugated sandwich panels with 5 cm thickness
- All walls of wash and toilet areas covered by laminated waterproof sheets
- All walls with opening 48×68 cm with steel base for air-condition machines
- All walls with window opening 100×100 or 120×120 cm

Internal Walls
- Sandwich panel covered by both sides decorated by plywood with red varnish colored skirting

Roof
- Steel angle roof truss with dimensions required as per the building space, using runners tubes fixed by 7×7 cm angles covered by galvanized corrugated sheet 0.35 mm
- All roof covered by heat polystyrene insulation
- Pre painted corrugated metal roofing sheet, white color, gauge 29

Plumbing
- PVC sch. 80 for cold & hot water supply piping

False Ceiling
- Inside false ceiling: Armstrong 60×60 or decorated plywood

Electrical
- Power supplies as per requirements
- Adequate distribution panel board 3 phase (Electra with GE breakers or equivalent)
- All wires insulated in PVC pipes inside the walls and inside the false ceiling

Partner with us
Need a Supply Solution?
Contact MEM Tech General Trading to discuss commodities, industrial products, equipment and procurement requirements.
Contact Us